Collections
Showing 1-5 of 5 results found
oral history
oral history interview
oral history
Kim Kapur worked on the Crossrail project on behalf of London Underground (LU), ensuring that the Elizabeth line stations that would be operated by LU were fully integrated and ready for operation.
Olivia Perkins joined the Crossrail project as a graduate civil engineer in 2010. She worked at Tottenham Court Road as a field engineer during the excavation and sprayed concrete lining works on the tunnels.