Jim Forrest worked as the construction manager for Whitechapel station. Having retired twice, he was drawn back to work when interesting opportunities came his way, Crossrail being one. Jim worked on the Crossrail project until 2021 when he retired for the third and final time at the age of 83.
Olivia Perkins joined the Crossrail project as a graduate civil engineer in 2010. She worked at Tottenham Court Road as a field engineer during the excavation and sprayed concrete lining works on the tunnels.